
University & R&D township
Next door to the National University township and the eastern-HCMC industrial parks — a standing pool of student, professor and white-collar renters within walking distance.

Four towers on the Pham Van Dong avenue — a long-hold asset, read like a prospectus.
Pham Van Dong Avenue × QL1K · Dong Hoa ward · Thu Duc City · HCMC
Aerial · 1.32 haThe dossier
A four-tower residential complex by TBS Land, rising directly on one of the busiest commuter avenues in eastern Ho Chi Minh City. Built for the long-term holder — ringed by industrial parks, universities and the under-construction Metro Line 1 extension.
Location
On the Pham Van Dong frontage — the corridor that ties central HCMC to the eastern industrial belt, then runs straight onto the Long Thanh expressway grid.

The infrastructure case
Four infrastructure projects converge on a single address.

Next door to the National University township and the eastern-HCMC industrial parks — a standing pool of student, professor and white-collar renters within walking distance.

Ring Road 3 feeds the site straight into the regional motorway grid — including the express run to the new Long Thanh International Airport (opening 2026).

The QL13 widening doubles the carriageway between Binh Duong and HCMC — a direct cut in travel time for residents commuting into the central districts.

The Binh Duong ↔ HCMC Metro Line 1, now under construction, will wire the site into the regional rail network within the life of the project.
On-site facilities

Resident lounge

Podium retail mall

BBQ garden

Olympic-spec main pool

Sky pool

Glass sky-bridge
Handover specification
Every apartment is handed over to the build spec below — An Cuong (timber), Hafele (hardware + appliances), Panasonic (lighting), Nippon Paint and Vinh Tuong (ceiling). The brand schedule is confirmed in the SPA.




Master plan


Floor plans
01 · 1BRNet area · ~38 – 45 m²
Investor lock-up · expat single
02 · 2BRNet area · ~58 – 72 m²
Young family · co-living
03 · 3BRNet area · ~78 – 96 m²
Family · long stay
Show unit



Live from the site · The latest shoot
Drone and ground-level frames of the site as it stands today. The towers are structurally complete; the glass sky-bridge between the cores is installed; the pool deck is filled and tiled; the podium landscape is planted. The showroom on the avenue is open daily for a private viewing.














4 / 4
Towers topped out
Installed
Glass sky-bridge
Filled
Podium pool deck
Oct '26
Handover
✓ Q4 2024
Piling complete
✓ Q3 2025
Basement + podium structure
✓ Q1 2026
Towers topped out
→ Q3 2026
Finishing trades · M&E
→ Q4 2026
Handover begins · October
Early-booking policy
Schedule 01 spreads the consideration over 16 months; schedules 02 / 03 / 04 trade heavier upfront payment for a deeper discount — up to 10%. All four hold 5% back to handover (15 Nov 2028).
Schedule 01 · Standard
Ten installments spread evenly across sixteen months — the gentlest cash-flow plan.
Schedule 02 · Fast-pay
40% on signing, four installments through Q1 2027, the balance held to handover.
Schedule 03 · Fast-pay
55% upfront, three small installments through autumn 2026, a final 25% in March 2027.
Schedule 04 · Fast-pay
70% on signing, a single milestone in late 2026, handover retention only.
NotesThe 5% retention at handover (15 Nov 2028) is identical across all four schedules. Discount is applied against the published list price, before VAT and the sinking-fund contribution. Foreign buyers are eligible for the same plans, subject to the project’s foreign-quota allocation. Contact a Vietnam Homes advisor for the live price list and the units available under each plan.
Reserve
A senior advisor will be in touch within 24 hours with the official price list, the unit-mix availability and the foreign-quota pathway for overseas buyers.
A native-speaking advisor in English, Mandarin or Korean guides you from first enquiry to handover.
We confirm the project is cleared for foreign ownership and check the remaining 30% quota before you reserve.
In-house legal counsel reviews the SPA, payment schedule and pink-book pathway, with translated and notarised documents.
Funds are routed through regulated Vietnamese banking channels so your inbound transfer is documented for future repatriation.
Direct allocation from developers means launch pricing and first-pick units — no broker layers between you and the source.
Property management, rental sourcing, tax filing and resale — all handled in-house after you receive the keys.
Vietnamhomesinvest.com is operated by Vietnam Homes Group — a firm built around foreign buyers, not retrofitted for them.
A track record across all 63 provinces, with the buying journey delivered in your language end to end.
We publish only projects cleared for foreign ownership with a pre-checked pink-book pathway — no surprises at the notary.
Every advisor speaks at least two of English, 中文, 한국어 and Vietnamese, so nothing is lost in translation.
Our duty is to you: independent due diligence, honest comparisons, and a clear view of risks before you commit.